Uncompromising Quality

From compound design to final inspection, our IATF 16949 certified quality system serves EV/energy storage, industrial equipment, semiconductor, and Tier 2 automotive customers — with compound traceability maintained across years of production. Your 2030 PPAP file will still match your 2026 part.

Global Certifications

Click any certificate to view details and download

IATF 16949:2016

Automotive Quality Management

View Details
Valid

IATF 16949:2016

Automotive Quality Management

TÜV SÜD
Expires: 2026-03-14

ISO 9001:2015

Quality Management System

View Details
Expiring Soon

ISO 9001:2015

Quality Management System

SGS
Expires: 2025-06-19

ISO 14001:2015

Environmental Management

View Details
Valid

ISO 14001:2015

Environmental Management

Bureau Veritas
Expires: 2026-01-09

RoHS & REACH

Environmental Compliance

View Details
Valid

RoHS & REACH

Environmental Compliance

Intertek
Expires: 2025-01-14

Need Quality Documentation?

Download our complete quality manual, inspection reports, and material certifications from our Technical Resources page. Visit Technical Resources →

In-house Laboratory

Our in-house testing facility validates every compound and batch to recognized ASTM and ISO standards — not outsourced to third-party labs we can't control.

Rheometer (MDR)
Rheometer (MDR) Cure characteristics analysis ASTM D5289
Universal Tensile Tester
Universal Tensile Tester Strength, elongation, modulus ASTM D412 / ISO 37
Aging Oven
Aging Oven Heat & ozone aging simulation ASTM D573 / D1149
Video Measuring System
Video Measuring System Dimensional inspection ISO 3302-1 Class M1
See full ASTM/ISO testing matrix on our Testing & Validation page →

Total Process Control

  • :
  • :
  • :
  • :

All equipment is calibrated annually by CNAS accredited third-party laboratories.

Visual Proof of Excellence

Incoming Material Check

Incoming Material Check

SGS certified raw material verification for every batch.

In-process Monitoring

In-process Monitoring

Real-time SPC (Statistical Process Control) data tracking.

Final 100% Inspection

Final 100% Inspection

Zero-defect guarantee through manual and AI-assisted check.

Why We Run a Single A-Mixing Line

Three operational advantages we deliberately preserve:

01

Compound consistency over years — your 2030 PPAP reproduces your 2026 part exactly.

02

Cross-contamination control — sequence-ordered scheduling + strict SOP between batches.

03

Engineer-witnessed batches — real-time rheology + Mooney review on every charge, not sampled.

See our compounding capabilities in detail →

Full Traceability Chain

Our automotive-grade heritage means every component follows a rigorous evidence-based manufacturing cycle.

01

Raw Material

Incoming inspection and batch certification

02

Compounding

Automated weighing with full digital logging

03

Molding

Real-time process monitoring and SPC control

04

Inspection

100% final inspection with traceability records

Trust Evidence Center

Verification assets for quality teams, sourcing teams, and compliance audits.

Supplier Traceability Chain

From approved suppliers to final outgoing inspection with digital batch references.

Stage 01

Supplier Qualification

Approved supplier whitelist by material family with annual re-validation.

Stage 02

Raw Batch Binding

Each incoming lot is linked to batch ID and certificate metadata.

Stage 03

In-Process Tracking

Compounding, curing, and inspection nodes keep complete process parameters.

Stage 04

Shipment Traceback

Every shipped lot can be traced back to raw material and process records.